001all right we are now live so good evening everyone and welcome to the January 22nd Lichfield school board meeting the time is now 5:36 we're running a few minutes late due to sorting out some technical difficulties I'm going to call the meeting to order and we begin with the Pledge of Allegiance please I pledge allegiance to the flag of the United States of America and to the Republic for one nation under God indivisible with liy and justice for all all right uh we do have remote participation this evening Vice chair Ames is remote uh with that I do uh want to entertain a motion to allow um remote participation this evening but before doing so uh this Ames if you could just State uh the reason why you're remote this evening and if anybody's with
002you sure with a dog myself all right well we hope you feel better soon and wish you a speedy recovery thank you very much I'll make a motion to allow remote participation thank you Mr Shoemaker thank you uh any additional discussion I'll call the vote please roll call vote Mr plansky hi Mr Shoemaker hi I am and ion hi thank you that carries 40 uh all voting this evening will be done through roll call from this point forward all right um with that we'll move into review and revision of agenda I know uh obviously we met just last week so uh this week is largely focused on a facilities update and we have on-site Insight starting this evening but any changes to tonight's agenda no no okay we have consent any uh board members like
003to move anything off of consent tonight no I just wanted to note that I we did have a curriculum committee meeting today so the the are updated great thank you for that all right excellent moving into summary of non-public actions from January 15 2024 uh Miss Ames motion to approve the December 18 2024 meeting minutes Mr Shoemaker second and that motion that motion passed - z uh tonight we have presentations and recognitions again as mentioned uh we have onsight insight and this is largely focused on a facilities update this evening uh we have uh several members from our facilities Improvement committee tonight welcome thank you for joining us this evening uh and with that I'll turn over to the superintendent to get things kicked off yeah um so we have Tina cardosa here this evening
004she's from onsite Insight she's the one who completed the reports for us um we got them in December I feel like we did the walkthrough back in November at this point beginning of November um it flies by time and doesn't all at the same time so um we had a few questions coming from a couple of people so Tina has those questions and is ready to answer them um the board has the hard copies of reports in front of them I'm going to project up here on the screen each one as we go so if we need to reference um a specific page we can and here we go share that tab I'll make it a little bit bigger to see okay a little bit bigger there we go um and so we'll start with
005just Campbell High School because it's the first one um just uh I don't know how we want to go about this 100% so you know the work that on-site Insight does as we've talked about um a few different times as they come in they do an assessment of literally your Capital needs so they're looking at how the condition is of the building um they're trying to help you project what your needs are going to be over the next um you know 20 years in terms of of capital needs for example like if you're going to need a new roof an HVAC system those type of bigger projects and also some smaller things things as well um so we had this done for all three schools so we can um work towards I know the immediate
006focus is on GMS for a lot what we're doing but from a district standpoint we want to do long-term planning and figure out our budgeting and this part the warrant article that we have up you know of putting money away and stuff um so we can start doing these um kind of bigger projects in an efficient way so we're starting with the high school here only because uh I just started with the high school there's no magic reason um you know uh Tina put together a nice like 20-year plan um the high school's about 25 years years old um celebrated 25th anniversary this year so it's up it's starting to be up for a lot of a lot of bigger things um so I don't know if I just if if we want to just
007do question and answer if you want how we want to go about this yeah I mean maybe just a summary from each building and maybe we can turn it over TOA highlights for sure so I have a little cheat sheet here of each building um so your high school um like Brian said it is 25 years old and 25 in building industry is the magic number 20 to 25 um so surprisingly probably to a lot of people the the cost per square foot projected cost per square foot for um the 20year total for the high school is pretty high um it's about $116 per square foot for the next 20 years um you're however we look at 20 years but we really tell clients to focus on the first five because Beyond five you can
008estimate but you never really know as far as cost go as far as interest rates all of that so your first fiveyear projections at the high school total about 4.1 million it's because of the age of the building and systems are just aging out um you did a big asphalt resurfacing of the student lot but the rest of the asphalt's original that's a big expense that I have in year two um the boilers the energy management system all of that is original the rooftop units um the roof itself is original and that's a large expense so I should back up a little bit too what I do and what we do as a firm is we look at life cycles of all components um but then I also look at projects so the high school
009has a large amount of rooftop units so you wouldn't go up on the roof one year and replace all those rooftop units and then the following year do the roof so some of those rooftop units May last an extra two or three years but it just doesn't make sense to not do them at the same time so when you look through the report I try to line things up so that you're doing projects rather than some of the stuff it may seem premature but I think in the long run it benefits you so the high school especially the rooftop units you do the roof um and then the exterior projects you can tend to move those over a couple years but if you're going to do exterior Mason repairs you do the cocking and sometime
010and here you're not going to have to do the windows when we get to the elementary school talk about that but the windows the doors and things like that so um at the high school overall um it's about 57% of the costs for the building so which means exterior interior finishes um 14 18% I'm sorry for the mechanical systems and about 25% for the site features the high school anybody has any questions specific about the high school can now in this report just to help people along who don't necessarily have in front of them right this second it might be watching from home or later on or something so you map out in the 20 years like a rough estimate of when these things should be done so like in the high school for example
011that roof is probably and roof units is one of the first things you mention here that should be done at the high school group together and then from there that sequencing so this is kind of a you know for people who are here in the room or or at home we have a whole 20-year map that shows the pricing estimates of these things and group together on when we should do this these different you want to go to page 44 yeah I can just show yeah this is where I was pointing at yep y so in the world world of capital planning we break down each facility in categories so this first page shows you the site category and all the things would be parking lot um track he lighting sheds all of that stuff
012if you go to the Top Line it's kind of hard to see far away but each element has a line item so the first line on site is the roadways parking then there's a quantity so I had stacks of drawings of your facilities at my house um and so those were taken right off of your blueprints so the quantity and then the next column is a cost so it would be for this it would be um either resurfacing cost or like seal coat restriping then total cost total total cost is in 25 20 $25 the next column is your age the next is expected useful Life So currently the majority of the parking there is 26 years old expected useful life is 30 so year four you would have costs to replace if you go
013down to page 45 the next line the top you can see that in year four those dollars are dropped in but they're also increased by 3% annually so we have an inflation factor of 3% so the total cost on the previous page was 405 but in year four it's 442 so the other thing I want to mention is Brian and I talked about this when we did these and we didn't put any cost in year one because of the way year warrant articles and Things are Written so because we did that automatically all the costs are increased in the plan because year one in the plan is showing is 2025 but you don't have any costs does that make sense to everybody all right and then and then there's some items that'll say in one
014year or over 19 years when it says over 19 years it's like an annual allowance for things so the cost are spread out um and then there's some notes to try to explain that for everybody on the the last column does anybody have any questions about the way the format is okay um so like I said we break down every facility into categories the first is the site and then the next category is the Mechanicals which is Boiler Room Boiler Room systems think of like boilers heating boilers boers domestic hot water boilers the next section would be building mechanical which is the systems um distribution piping um electrical systems elevators fire alarm systems then the building exterior which would be doors the facade Windows roofs and then all your interior spaces um interior spaces is
015start at page 52 we start with the Halls the stairwells and then the high school has the SAU offices um and then admin classrooms Auditorium I tried to break it down as much as I could um so that you could see what the cost if you wanted to like what your total Auditorium expense would be you could calculate that um there's a couple graphs at the beginning of the report page let's see here of the high school it's page 38 it's a capital need summary so this is a graph form all your cost for the next 20 years um and you can see the four categories on the left site mechanical real building mechanical and um architectural year one is blank down below but this gives you a pretty good idea um as expected architecture
016is is usually where most of your costs are um and then below that the next page page 39 is the totals per year year 14 it spikes because of systems and at that point it would be 40 years old let's see here yep so that would be like the next window of stuff like 30 years is like a 25 30e window get some more stuff to that 4 year windows that would be another Spike where you would see stuff increase if you were to like follow this religiously right like we know we're not this fall building or putting a new roof on on CHS we don't have that that funding right now to do that type of thing so um but like if the idea is yes you do this and like those kind of
017those waves you know you build back up you know you do your initial big project like if we were able to to get the money for the roof units and the roof and everything in you know four or five years then empty that kind of Reserve fund build that back up so when another big Project's up and another you know I don't know if we want to wait 10 years we can see where we're at at that point like the building and everything but you build it back up take the money out take care of that stuff and then start that cycle all over again so the one I add I added a reserve plan in here for you I know you don't have a dedicated replacement Reserve we do have a reserve there's just
018not that money in it um Pages 41 42 and 43 is just one go at an analysis that'll show you what you actually need to fund just this high school they they're not combined the schools so um if you look at page 41 it says starting balance of four uh sorry 5, 250,000 with uh annual deposit of $22.50 per gross square foot um one number I threw in there just to show you if you want to start funding your reserve to fund all the needs projected in this plan what what does that number look like so I did that for every school and that's what the basis of having that money in year one to put in there right so you know if we were sitting on this amount of money than at warant articles
019of about 285 a year that's what that's representing but we do need to build some of this Reserve first before we can get to that more consistent number it's important to also remember that this is just a planning tool that none of this is set in stone and and I can't predict you know next week you may have a hot water tank below and it totally blows this you know so um that's important to remember and it's also important to remember that the interior of the rooms and finishes and things you know of course it'd be nice to replace the floor every 20 years but realistically who you know we know that that might not happen but you do have to plan for it because it's not going to last a 100 so it's to
020put it out there I guess I don't understand this slide right and when I look at the slide I'm interpreting the slide just looking at the visual and I understand kind of the wording down below but the visual tells me I need to be putting away 2 and a half million a year just High School correct that's correct but the the the description down below says annual contributions starting at 285,000 with an initial deposit of 5.2 so how do I balance the two I put an initial deposit of 5.2 and then it's 285 or I at least put two and a half million in a year no it's not 2 and A5 million I'm sorry it's 285,000 a year increased at 3% annually right but if I look at just the graph right kind of
021the Baseline over the next 13 years the low point over the next 13 14 years is 2 and a half million is that the running balance of what you have to have no this is the Bal this isn't your needs this is looking at the replacement Reserve balance so that's the balance in the account so we have to get to that the maintain that you could so that's not the I'm not saying we are that's the suggestion is a suggestion right like I think it's a and and I don't want to step on toes here like a huge pie in the sky right like if we were hand over fist over money yeah we would want millions in reserve in terms of building stuff right well and also this is factoring and not bonding anything
022right like correct so so this is if we were to try to pay for everything out of pocket right and we know that you know financially that's probably not possible possible so we are going to have to dig into this and try to figure out what the balance is for us on how much we want to pay out of pocket versus how much we want to bond I have a question for you um when we talk about replacement cost we're talking about like kind equipment right oh sorry yeah there were a couple questions about that yeah oh I just it's seemed like an opportune time to I Know Dan dwit can't be with us tonight he's got the flu and strap so uh so he's he wanted us to ask a few questions yes so
023um replacement in our plan is Inon unless there was something specific flooring for example like this room has carpet unless uh you know throughout the district you said we're taking carpet out because of allergies we're putting in vinyl plank or whatever then I would incorporate that but everything else is in kind um the we don't carry upgrades I know that like not so much the high school but the other schools you could probably upgrade your boiler system system to more efficient systems I'm not an engineer I'm not a mechanical engineer we replace in kind and I you'll see in some of the other schools that I've carried allowances for you know Engineering Services or that sort of thing um but yeah it it's a lot easier and and more accurate if you do in line
024and then you can go from there so I was able to do the walk through with you at GMS I was able to make the other two schools so I know we're going to get to GMS but as since we're on the in kind um discussion when we were in the uh like the Boiler Room there was a boiler like attached to the ceiling and you said you can't take that down you would have to just decommission that and put one on the top of the roof so when you do when we talk about in kind that would be a scenario where you would have you would have been quoting something going on top of the roof right probably okay or um not so much on the roof but in engineering service because you could
025also put some cuz I don't know if your roof could hold it sure okay so that would be something where you'd have to have an extra engineering fee on top of your replacement gotcha okay um that school I I did carry extra for um electrical upgrades as well so an electrical um engineer to come in and look at your electrical systems the Distribution Systems um the older build it it was only for the purpose of understanding kind that was the only reason I brought that up um and there was one other question about does lighting replacement include updating to LED um so the only lighting I've carried in the plans are um the gymnasium lights at one of the schools the middle school has already been upgraded and the high school is pretty well LED
026so I don't we just replaced all the LEDs yeah so there really isn't a whole lot of lighting upgrade or lighting replacement in the plan so I don't know what that was specific for um I think that was it as far as questions okay pretty high opening at C doeses the fic were we allowing the fic to ask question I would love to yeah I want this meeting to be very collaborative so if the fic has questions please by all means Mr oenus T nice to have you with us Ron um so just for my own edification I did a whole spreadsheet putting them all together um and I did send it out so I know people look at it but St on Campell High School the total uh comes up to 133 million and
027just $2,000 and um it front loads and that's kind of splits about uh half uh each 10-year period uh as uh Andrew mention you see a a uptick in the second half around 14 to 15 so essentially which if we were going to do this kind of on the schedule we we need a a big upfront cost for both Campbell and then uh we'd have a maintenance till year 10 or thereabouts and then have another jump up that would require maybe a second Bond just kind of talking out loud but just looking at the the cash flow it starts out the first year 2 million and 3,000 then at uh year four we have 1.4 so when you add that all together that's kind of like a 5 million over the first couple of years
028so that's certainly more than we could take out of pocket so to speak M so I think somebody talked about Bond so to me that saying you need to come up with a bond to begin with to get you started and then um decide how much you want to bond of let's say the first 10 years you want to bond five 5 million and then try to cover the rest of it toward the end with others is that is that kind of how that that flow of expenditures looks like to you well the good thing about my report and the good thing about what I do is I don't have to decide how it's fun funded MH um good thing for you so I just sort of I do the report and put everything in
029the report that I think your buildings need and then sort of hand it off and say have fun um but I guess you know if you're going to bond everything then that it's ultimately not my decision um and and again it's not that you're absolutely to this plan either understand so I guess my point but I think is going back to what Andrew was asking is your assumption shows a big in flow of cash at year one um so it starts out at a reserve of 5 million I think according to that for the TA so that's got to be either you have it in the bank already or we have to but here's theity I mean we're all hearing about a police station just putting it in reality right and they're looking at bonding
030that at $6 million over 30 years and now we're talking about 5 million in one year reality is we can't absorb that we can't right so what do we do and we're only talking one one school we're not even talking about the other two schools right right so I mean we and we talk about bonding andure that kind of in my man kicks the can down the road right and and defers costs and and we're paying interested on that all that job but in year 14 15 guess what happens again going do it again right now I got to take out another Bond but I'm still paying the first Bond well depends if you set it up as a 10 year bond but you know what I mean but yes but that's going to be
031equally expensive and we're paying a lot of interest on that so I I think with this what going to be important for us to dig into all the details right like I zeroed in on this graph right here because this the rough estimate of capital needs assessment you do see the same the two initial spikes that first Spike if if you go down a few other Pages here in year one and uh the next page and this is just still big picture stuff but you'll see that first spike is dedicated to um this is Page 39 38 yeah I can see it on my PDF uh thing but it's about halfway through the packet um it's there and um you can see that like the big those first chunk of things at the high school
032probably the most pressing is going to be Roof Systems and things related to The Roof Systems like mechanical and electrical units connected to that right so whenever we start this in an Ideal World if we were sitting on millions of dollars we would do it this summer but we're not sitting on millions of dollars to do it this summer right but that should be kind of the first swing at this building in my opinion is looking at the roof and then the roof units associated with it so if we start to to to put away the money with that Target in it I think that's the reasonable Target you look at it it's that about 2 million number in that graph above it you know project that out a few years down the road with
033that 3% increase 2.3 $2.4 million that next bike in the year four of that that bar graph and year four in this graph right here you see is around Road surfaces like when you dig into the detail of that I would say and Tina I'll look to you to to either say you're crazy or not crazy that is not as pressing of a need our driveways and our road surfaces at the high school while the like life expect y would be about that 30-year Mark right the actual condition of them we've done a nice job of maintaining them we have good plow service there that keeps care of it and stuff like that that's not pressing of a need we wouldn't need to do that Million Dollar Plus right away in a second year after
034the roof right like we have a little more time to put money away from that I think that's the power of this and these reports that we're Gathering is it gives us a sequencing and a roadmap and like focusing on when things could be chunked together in the big picture of all that type of things so you know we got to talk about how bonds putting it away whatever the different different ways are to approaching this but identifying with the help of professionals what are the absolutes like these things got to be addressed and what are the things where we look at okay our our our driving um roads and parking lots are still in pretty good shape we can move that down a little bit further on our like big Capital Improvement plan and
035stuff right and so if I'm if I'm hearing correct you're factoring in for soft costs as well with to the to the best of your ability what we talk about like when you're talking about like the engineering and stuff like that some of it engineering where it's included is a separate line item um overhead like GC cost and stuff like that is not so um labor for small ticket items like flooring painting that is but like a large scale you're going to hire a GC probably for the roof and that's not included okay does that make sense yeah okay so I heard you say sorry Marilyn W also on the facilities committee um one of your first sentences that you read off your cheat sheet um which I kind of want to get back to
036like what did you if you were summarizing all of this multiple page report in like five C the elevator speech that's I think what you started off with um but you said like the next five years is I wrote down approximately 4.5 million is that what I did I hear that correctly right so so you know Brian mentioned you know the first spike in that five years is the is the roof at 2.3 million and then paving at another 1 million I guess it you know so that leaves my math you know another 1.2 to whatever one million and a half in that first five years is that a lot of are there any critical items in that chunk of the first fiveyear budget or you know so so we have a good idea of
037what is imminent in the next five years and what is potentially like the pavement defer because you can keep pavement going with other less expensive Investments I would say from a building standpoint you always want to make sure your building is secure and watertight first and then Life Safety Systems so the roof the fire alarm panel um exterior cocking which would make the the building secure and water tight um and then and then you can look at interior finishes and roadways and things like that so just looking quick I see the boilers in year four in this so I would say that like you group that with the the surfaces right in that year four but obviously those two things can be pulled apart right we can prioritize the boilers system over the roads in
038that in that in that uh situation and stuff yeah yeah did that answer your question okay I'd like to turn it over to miss Ames Miss ases I know it's hard to participate remotely but do you have any questions question app hard how expensive the school is and then question is we M and notl um yes and no you know some stuff is at your discretion so you know could you live with the parking lot for example just continuing to patch continuing to seal coat continuing to do stuff like that and instead of replacing it at 25 years replace it at 40 lots of places do that um New England not so much you know it's going to get beat up in New England but um where the other big discretion is the interior interior
039finishes things like that painting flooring stuff like that um so I guess I don't know I guess I'm at a lawsuit well I think if I'm if I'm understanding it correctly said it wasn't question I just appreciate try to around it I think I think my understanding of it is that they're here to basically tell us if you want to maintain a building exactly the way it should be maintained in a perfect world this is how you're this is what you should be doing right and so like reality versus that are maybe two different things so this is really just a road mapap to Perfection and we have to figure out how close to Perfection we could actually get the re the also the reality is this should have been done 2016 years ago the
040prime time to do a capital needs assessment is during construction because then you're looking at finishes you're looking at construction and you're starting to plan for things going forward unfortunately a lot of places or behind the ball and you're sort of playing catchup at this point but um you one suggestion if you build a new school or whatever you start from ground zero and you plan going forward that me to my next maybe it might be well along those lines we don't have to jump right to LMS but if you look at LMS you just did a ton of work at LMS right so you there's not many expenses until way down the road with LMS that's like why this was a good time to do that for LMS right like we just had that
041one building you finish up all those renovations to that building you then do your capin improvement you can really slowly start to put it away towards taking care of I know what I I know I know I know I know um but like in a perfect world we're talking about it's there right so my next question right and it it's probably a very loaded question for similar size towns right what's the average school districts put away for these types of projects I mean d i mean you reference B right all the time and they put away a million a year they put away a million a year how much should we be on average putting away in comparison to other towns I don't know okay I don't know I honestly because I do the report
042and sort of walk away because then you get into funding and all of that and I don't know um and you know the I do reference B lot that's newer right that was them identifying that they were going to do their Elementary renovation right and like hey we don't want to get caught in a bad spot with that down the road the high school's starting to age out right like it's hit it's 5 years ahead of Campbell essentially right so it was hitting its 30e Mark um two years ago I think they hit it or whatever it was right so an identifying like oh we're going to have some big ticket things let's start putting some money away so I think what's tough with that question too though is that you have to then look
043at the big picture of each of those towns and see okay like were they bonding like are they do they are they in disrepair yeah it's like yeah this is a really trick I mean they were advantageous they had the the power plant there for so long that they were they they could do get a lot done financially because of it you know should we move on the LMS we should yes yeah it gets easier and then it gets harder we'll take the easy one and then a 10 minute 15 minute conversation and then starting our okay so this one the total 20year costs were about 7.7 million or $95 per gross square foot in 20year costs it's still is kind of High um 57% of it is the architecture part of it exterior interior
044finishes um 24% site and 18% mechanical systems so the near-term cost here which is going to be a challenge is the parking lot and here's one that I did carry an engineering fee for um let me get to this line here um because I I have some design background but not enough and and I really stared at your this parking lot for a while and I just I don't know what the ultimate solution is because you've got handicapped accessibility issues you've got all sorts of issues there um so I think you need a civil engineer to get in there and give you a decent design and direct traffic flow and all of that so this is one that I did carry an engineering fee and then in year three just a base allowance and it
045may be way more than this um depending on what they come up with how do you estimate engineering fees um it's an hourly fee and I figure couple probably a month or so of work um this one's going to be tricky because of the storm water issues and all of that stuff so um so that's a a near-term cost the other thing that wasn't done during the recent Renovations was the um fire alarm system so I believe the fire alarm system dat is from 2007 um typically these systems start aging out at 20 to 25 years because of um mechanical electrical and not being able to get parts so that's a near-term cost that's probably unanticipated but it's monitored it's maintained by a contract they might tell you that they have extra parts and you'll
046get two or three years out of it but that should be on your radar here um and then the exterior here as well old the older Parts the old doors um the old part the old cont um sorry the control joints that were not done with the renovations are in the near term and there's some minor things like the um bleachers in the gym gynasium are old um there's one classroom that's very loud so that's in the near term to try to get some sound proofing in there um but other than that you're right all most of the costs are in the second half of the plan here there any questions about this school and again I think that reflects just like to help the comparison Campbell's an older building that hasn't done much of
047that these bigger projects done to it because it hasn't needed it but it's approaching that 25 30 year mark LMS has had a bunch of work recently done to it so like when you compare this graph to the graph we saw at CHS and the similar graph at LMS they're radically different much smaller here at the beginning but then 17 if you think the renovation project started about 3 years ago give or take you know that's when you start to see that 20e Mark so some of the stuff being on people's radar so you you guys do this for a lot of schools right when you're present do do you typically present to you know so the we're just the exception we lur you in yep I do a lot of Zoom calls but just
048typically with one person so even based on the loves me so we tend to um we as a small District we tend to in my opinion overload our superintendent with a million responsibilities that I'm not sure are superintendent's responsibilities but nonetheless they do them here when you're dealing with other districts even if it's just zoom calls is there a person I mean we have a facilities director but is there a person that's like a true Point person on this and like what is that position if if it is is it a facilities director okay that's the last three school districts I've dealt with the facilities director okay just contracts are signed by superintendent and they give me the facilities number name and number and and Dave was a part of this process absolutely he came
049with us in all walk he was great yeah I just was more so like trying to understand like with other districts how they do it and and I think part of this is me being in my first year wanting to gain all the knowledge of all these buildings right I'm not this is not criticism of you this is just this is historically how it goes is that we have you know superintendents running building projects and stuff that are right um any questions on LMS from the facilities committee so if I to just sort of be apples sorry to be apples so your total Capital first five years fors is plus or minus a million a million yeah largely driven by the parking lot half of it's the parking lot parking lot and the fire alarm
050system okay and then the the septic system is a big cost later on right oh boy I can't remember sorry I do five or six of these reports on Mon CL me I can't remember in year 2036 you got it yeah year 12 yeah year 12 but the the parking the parking cost parking lot cost that you've estimated is really what you're saying is we don't really know what we're going to have to do for it so like it's kind of just like a taking a shot in the dark to not necessarily shot in the dark but it's we don't know the full scope of the project so you can't really accurately estimate that per se right so what I did was I carried our standard resurfacing cost okay um which is 350 a square
051foot I carried that then I carried storm drain replacement I measured out the length of your storm drains storm drain replacement which is about another 137,000 um and then the engineering fees what I didn't carry because I'm not sure I think you're going to end up putting in retaining walls because of the layout of the bill and that's not in here so that could be another hundred easily but I don't know um and it's just one of those unknowns I still have to go back and do final reports so I could throw a number in if you wanted me to like I think for us it's just more important for us to know where cuz cuz as we move forward we're trying to figure out how much of these numbers can we really actually rely
052on is that's what it's going to cost us versus how much do we have to add to so I don't think we necessarily need you to do that but yeah accessibility there is the issue and it um I think you might end up taking some of that front patio away or something because yeah any other questions on LMS all right them in the room okay so um so um the elementary school totaled about 7.7 million over 20 years or $124 per gross square foot um first 5 years totaled about 5.4 million ion the year 2 year three numbers are pretty large here um with some things that I think you could probably defer like wood fencing at the back of that building or the rear fire egress patio that could probably be deferred but there's
053some pretty major systems at this building that are um at or Beyond standard useful lives and you may end up with surprises eventually um you have 1972 and 1978 septic systems um boilers pumps hot water systems are all um Beyond standard useful lives the heating and electrical distribution systems um once you start replacing boilers I think you're you're going to end up redesigning and installing new heating distribution and electrical distribution um the fire alarm panel here is also at 20 years then we get into the um exterior there's older doors windows um lentil above the windows that are rusting that need to be replaced um and when I was there I was told about um dehumidifiers throughout the entire building and so I have carried a pretty substantial number for dehumidification units because staff sliding
054on the floor is probably not appropriate um so I think and and staff running around emptying dehumidifiers all summer is so you know again it's a number I put in there is it something that's needed probably you know it's needed but is it do you have to do it no um the other thing is the interior of the 1930s building currently isn't being used the um so I have carried costs on a square foot basis for interior design remodel of that building and the addition of an elevator to utilize that entire space um I think it's important to note that the the additions of this building that the building footprint just keeps getting bigger and bigger you're creating more and more square footage and you're creating more roof to be replaced you're creating um more
055flooring that needs to be replaced so with every addition the roof square footage goes up up and um so you have different ages throughout the building the different systems um this one was a tough one this one took me a lot longer to do than I thought it would um so I'm sure that there's lots of questions so I can stop talking about this one and you can start I'm just GNA listen so in terms of you know you talked about how it makes sense to bundle certain things together and one of the biggest questions that I think we've had as a committee is trying to analyze how much how much work could be done up to a certain point until you have to bring the whole building up to code do you guys take
056that into account at all when you're when you're doing your no okay because the only reason why we do it don't is because we're a national firm okay and every state has different different thresholds so it we don't um but conceivably if we were to package certain amounts of stuff together that would be something we'd have to Y okay yeah which would mean um full accessibility which is why I put the elevator in for the 1930s building because you would need to get full access to all four floor levels there um yeaha having read through your report and just heard what you said um my interpretation of your cost for HVAC the electrical Windows um the boiler uh side of it is that you're essentially looking to have those all replaced essentially upgraded to from
057what they are today is that kind of a fair interpretation of your assumptions well I'm saying that based on their age and standard useful lives that they should probably be replace and that's reflected in what you put in for cost um yeah I can that's how I that's how I read your report let's see so boilers are on page 42 so this building has three boiler rooms has two boiler rooms and three boilers sorry yeah um so yes Boiler Room two the boilers are in year two and four now some of this stuff I was aware that there is so much upfront cost here so I tried to move some stuff out um even though even though some of your items might be at standard useful life or Beyond but they're working um I I
058tried to move some stuff figuring that you know you have really the roof is one of those cost that probably should be done soon sooner or later right y but yeah what did you say boilers what else was on your list the boilers electrical system all gets upgraded you know there some rooms only have one plug in them um essentially the the upgrade includes uh adding panels and electrical outlets um the I think you actually have schedule in they replace all the uh uh individual Heating units in the building there is cost in there for control system upgrades there's cost in there for the fire and electrical fire gr yeah um so essentially every system in there is included in your report if I read itly I can't think of anything that's not um no
059not every system so what's not in the report is like hot water piping um sanitary lines okay for between Distribution Systems yeah um this electrical upgrade isn't the entire building it's the um the old section of the building the 1978 it's the older classrooms it's not the entire thing the new yeah 40s and 50s sorry okay but you you estimated where there parent need from up GR yes okay where their teachers are controlling the heat by the thing on the Pike um that is where I put the elect the upgrades for the heating so yeah right question from Mr lard thank you Joel lard um so you had mentioned that the heating and the electrical system you put in some uh cost for design and everything were there also cost for the um extra work
060in this side that goes into redesigning it you've redesigned the system now you got to install it right like do you have to cut holes and walls to run new duct work do you have to run new piping new electrical lines like there's all cost of social is that built into there as well I also have a second question so let me look um I'm I'm trying to find a good example for you um yes and no so the there's an allowance for an engineering fee and then there's an allowance for electrical for example for upgrading electrical service running new um running new wire and new Outlets it's this is based on a square footage basis of construction the the allowances for upgrading of electricals a square footage for so it probably it includes patching
061of the walls but running chases probably not so yes and no y you know what I mean are you in the construction field okay all right so so um minor construction yes but major construction like if you had to move walls no okay and on the second part of the second question is related to the 1930s building are there costs built in there for like lead paint or asbest abatement no this is we do not do testing for any of that I 19 30s I'm going to promise um but the 1930s building it is strictly I it is strictly on a square foot basis what I carried um because I have no idea what you're doing in there um it was just a number to throw in the reports there's not supposed to be any
062as best anywhere in the building except in some of the tile floor there's definitely asbest in the floor yes but does according to what we've been told the rest of it's been taken out including 1930 I believe it's in the gym and we know that M right I'm not sure in the tile right it's in tile just you can leave we've evaded the tile it's in the ceiling it's in the ceiling there's some inaccessible ceilings in the oldest part of the building the the initial 1953 section I can't confirm if it's there or not I just know that that's where you don't have the suspended ceiling you have the cat um like a okay I was looking here to wall type squares so it could be I don't think that yeah you need more investigation
063you don't know if those we contingency yeah exactly that's what that's my point right like there needs to be some contingency in there for if you run into those things because those things are expensive so we we talk about like uh upgrading boilers and stuff like that um one thing that's been that we've been told I haven't looked myself is scoped inside the cinder block walls but we've been told that there's a belief that there's not really any insulation in the cinder block walls and there's single cinder block walls there's nothing in here to like I mean really realistically our understanding is to actually solve that problem you would just have to build extra walls because you really aren't going to be able to insulate those but there's nothing to provide uh in that regard
064to increase efficiency in the building like we can upgrade the systems but the envelope itself is essentially the envelope minus changing out windows right yeah I mean I I didn't carry anything I could I could go in and carry an allowance per classroom to build out walls and insulate walls no I I just I just want to make sure I understand that's a big number that is a big number yeah we know yeah that against what your impact is to your efficiency and your fuel costs over the next 20 years right like basically like leaving a window open all the time if you got no installation this is the exact issue we had at LMS exact issue but there's always the ability to outsol that building there's a lot of new systems where the insulation
065goes on the side it's actually more efficient so and I don't know what the cost is of course uh can I uh question on Windows did I read correctly that you assume we replace windows at least in the older section um sorry let me get to that so yes over over a period of three years um phasing it in so classrooms 1 through 10 in year 2 the 1930s building in year two and then the remaining windows in years 2 three um so I tried to spread it out the reason that's so important is if you go into those the classrooms we just talking about as far as walls go the windows actually constitute probably 60 to 70% of the wall area correct so replacing Windows would be probably the biggest bang for the buck
066and then if you did insulation of the walls at the same time you'd have a nice classroom you done I think but the other issue though is those particular classrooms also have the Heat and the electrical issues um those those classrooms have a lot more problems than just the windows um in my opinion no I agree with you those the older classrooms are really where the focus is going to be applied so that to me that looks at you're looking at tackling that as a we'll call it a a system approach to do those all over the course of three to four years M well not even shorter than that probably two two years MH there's exterior issues on that wing of the building too that you would have to address at the same time
067does your report include cost and maintenance and upgrades to the Portables as well or are those left out of this no they're in here um but it doesn't include getting rid of the portles it does not include getting rid of them because I can't make that determination but they um the interior part of the Portables is starts on page 50 and then see like the there's one item concerning the Portables that actually is in the near term is those the ramp on the back one that needs to be done soon yeah we're doing them now you're doing it now y okay um we have to the health inspector said we have to that was FL like a week before I got there so yeah um but yes the Portables are in here the roof they're
068in here and is there a like estimated life over all of the Portables or something you think you can keep maintaining forever or is there like a time when like the just the whole portable itself is done and you got to replace it I think with maintenance you can probably continue to maintain it um it's just like any other building so it just has vinyl siding on the exterior and a roof so I think you know if you replace the roof and the windows if the windows need it I think you can continue to maintain it okay um I'm not sure what the structure is underneath or anything like that I don't know is there a block or Foundation underneath there's no Foundation trailer or something no it's like a trailer yeah there's no Foundation
069under those and then if those ever rust out or anything I'm pretty sure Dave goes under there with heaters in the winter right yeah yeah that's what he said yeah I mean I I have no like profession like nothing to quote professionally on this but they usually say it's about 20 years for a portable you know until now they can last longer or less but like that's about the Lort right you had those for 30 30 yeah build those kind of buildings are normally designed for a 50 year Lifan do you say 50 or 15 50 [Music] 50 what other questions on Griffin I think um you know you've given us kind of a it's this is this the 7 million over I'm looking at yes so the total cost all in for G for
070GMS according to this report would be was it 7, 73,000 um but that doesn't fix everything that's wrong with GMS this is to maintain it and to keep it keep it as is right again that's not addressing walls or insulation or I gu I just what my fear would be was somebody would say oh $7 million let's just do that and then GMS is is is handled well that's what I'm trying to I I don't know you know not being a non like not a builder I don't know and I still haven't retained even being in this committee yeah what things what questions you know when when they talk about soft costs and stuff like that like I don't know what types of things are you know not factored into this just because they're not
071that wouldn't you know from a project standpoint right for us to be able to say this is what we need to actually go solve problem right that I mean that's that's a tricky thing to decide anyway right there some of those things just not built into this initial report then like Miss Harrison said you're not addressing necessarily all the things that may be a need at GMS right like if you want to get rid of the Portables you need to move that space somewhere and maybe the 1930s building does take care of some of that but does it take care of all it those are things you got to look at and decide right I think it brings up the stuff so it functions correctly right like kids are warm right like you know that's
072that's important right kids are safe right like those are the things that we're want trying to maintain with these things right this doesn't clearly this doesn't scratch any surface on whether the best educational needs for kids right like there are some awkward spaces at GMS they do a great job of utilizing them but they're just like if you were building a brand new school you wouldn't have that service in that space right like but plenty of schools make do with what they have right that's just the nature of it like that's fine there are plenty of schools that do that but that's I think that when you look at these reports what it's doing like here is your building here's a big picture on the big things that keep the building operational and Kids Safe
073in it right that you got to maintain and keep up the stuff and that's what these these reports kind of represent and I think the work that we still have to do is like all right we're I think that like 7 million I'm just speaking for myself is like your floor right like cuz you need to keep your kids like safe right so that's the floor you're kind of working with now you got to figure out what you want on top of that right ceilings can go forever like that you could build a tajma hall and spend $100 million on Elementary School we're not doing that right so what is the right balance that the community feels good about the board feels good about that we can do for this building and might be you
074know bringing stuff up to up to where it needs to be making smaller adjustments or it might be something bigger that's what the work of that we're doing is so yeah one of the points is it's not 7 million uh in GMS is not $7 million now and 7 million's over 20 years yeah I think it's a lot though right off the it's 5.4 now in five the first five well it's 5.4 now if you do the 19 30s building it's $4 million if you don't do the 1930 so that's the that's that's the immediate and that's the option that you have the beauty is and I love that that you did and I appreciate that you did in 1930s I think that's part of our solution and for two reasons 1930s building is 4,000
075square ft equivalent to four classrooms the other thing is it it restores that which no one has assumed that we can't keep it even if the other part of GM GMS is gone so that solves the what do you do with it question as well and it can be used for anything it doesn't have to be classrooms it can be used for a whole bunch of opportunities designed any way we want read the SIU well we've said that before right like you see lots of other school districts where the oldest school building or part of a school building is turned into the SAU right like Hudson did that with one of their old buildings strategic thinking anding for the output of the fic right on kind of what some of those options are yeah all
076right any other questions Miss way yeah um just to clarification so I mean I did go through all the different line items at Griffin where things needed to be replaced because they're beond a useful life did you did you incorporate accessibility into that and in considering it or is this does does this address accessibility at all in in the costs and then the other thing is know the electrical system and the and the fire alarm system and everything is just to keep it status quo I didn't see anything in here and uh sprinkler system in Griffin so that's not there okay so that is not in there and that's a huge number I is there a reason yeah sorry is there a reason it was left out because it's not there we don't upad right
077yeah everything's in kind it's exactly the way it is now it's not any thing that could you're it it's if you had told me that the fire marshall in town is making you put one in then it would be in there but if if it was a code issue or something if you were cided then it would be in there but it's not okay and then the accessibility stuff is also not not in there so I think that's a big part big part of the whole considerations that we got to make right it's not just replacing in kind because you got to think about the long-term aspect of it that's that I was going to make that point yeah operating costs for the next 20 years just putting the same thing back in equivalent to
078what you would spend now putting of higher efficiency systems in that would save you money in the long run and they may last longer yeah do you have any guess on what a fire suppression system would be I seeing sorry sorry just gonna ask if there was any idea what a fire suppression system would run in that building half a million dollars I think that do well in today's dollars I thought it was more than that I thought it I don't know I thought it I have no idea it's a lot yeah a lot of buckets of water I don't know because then you're putting in Wells you're putting it's yeah you're running piping for 60 plus thousand square feet yeah sprinkler systems yeah Miss Ames thank you yeah I just wanted to back to
079the conversation I find it really inging how these reports can be applied to each school because what I heard CHS was what we GMS I heard this is in to what it is information in this report is keep the building at their current condition is that stat what the audience ago but I want to make I understand that yes and I I didn't do different reports they're all the same so for sure and again I appreciate [Music] it looking at M which recently had ration to it this report is very useful in terms of building GSS lot of issues beyond the mechanics of [Music] is that fair yeah you're you're at three distinct phes in the in your District yes can I just ask kind of following on what Heidi said though is that essentially
080the systems that are there now have failed or are not working anywhere near to what they should be DV a system being the good example uh in the 19 the early editions electrical is insufficient for where it should be so your estimat bring those systems up to where they should be is that is that essentially what you're looking at I for that that section of the building yeah yeah yeah so the heat will be nice will work the way it should be when we spend that money well I can't tell you that I I well if we have somebody engineer it to do yeah yes um but I don't think I think if you hire an engineer you're not going to replace the boilers with what's there anyway I think you're going to end up
081doing heat pump systems with stuff on the roof um so you know I've replaced it in kind but I think ultimately what you're going to find is that the new technology is you're just going to replace it with different systems with systems that the middle school has no solar sorry maybe a little different than what the middle school has he said no solar we I don't even want to talk about your solar Sy neither do I all right any other just W up Griffin and um and in the presentation from Tina uh any other questions on Griffin tonight all right any other questions on onsite gonna say preface that but I did note that you actually have some maintenance cost for solar system couldn't get out replacing all I think no that so no what
082starts in year 14 is the inverters inverters okay the panels start in year 20 and actually only two out of the 10year Cycles are showing up in this plan because it's a 20-year plan what's your expected life expect what is the expected useful life 20 and we we um this will come in a little later in tonight's agenda but as a sneak preview we met with Dynamic grid yesterday the superintendent business administrator myself as well as principal Grantham um and that directly aligns with what we heard from Dynamic Grid in terms of warranties expected life and what we also learned is some of the costs for for replacement of some of these materials for solar and I think one of the ahas at least for me was it's damn expensive they give you quotes did
083they give you quotes panels the panels like thean themselves are not expensive not expensive it's the thing underneath like I don't forget what like some of this stuff can be8 to $10,000 yeah yeah and so what you're going to hear tonight once we get to the warrant articles um and notably the solar warrant article we have to revote on the solar warrant article anyways because there was a discrepancy in wording we've updated the language of that warrant article for board consideration to not only include the up to language which we were talking about yeah but also not only to include the word um to build up the 100,000 a year right but also to include it as a maintenance fund to give the board the flexibility to have a fund for some of the ongoing
084maintenance of this solar array system because very clearly we're going to need some money set aside long term to maintain this thing I mean that's the whole purpose of the Insight report right it helps you build out a maintenance plan yeah that you can then start putting money aside for those future expenses correct and so onsite it the meeting yesterday like it all just we need we're going to need that for sure so thank you any other questions 5500 Heidi any other questions from your side I'm I'm good thank you any questions from our student reps I know a lot of all right well thank you very much great presentation we appreciate you coming in and spending an hour and a half of your time tonight with us thanc thank you very much I'll walk
085out I was y if the chair doesn't mind I'll walk team um with that next on our agenda is actually uh keeping with the topic of facilities uh moving right into a facilities update we haven't met since we had a board meeting last week we have a meeting tomorrow we have a meeting tomorrow are there any other General updates while we have the facilities with us we're working on the Matrix um The Matrix yes working on the Matrix and that's going to be the next big update is uh is looking at how each of the options uh addresses how we think it will address various either physical issues or educational issues um so that's what tomorrow's discussion I think is mostly going to be around okay great unless anyone else has anything want this to
086be collaborative any other updates from any facilities members tonight they're all jumping they all wanted to be here oh I can please related I was finish with facilities tomorrow but we had our do facility walk through today so I await that report U from the doe as part of the um Statewide accountability process that we're through this year were there any like he was pretty tight lipped I couldn't even get cut a glance at the sheet that he was using to assess him but he did tell me that he he deliver the report directly to Dave Ross myself and um Mr so I wait for that report all right well one day yeah one day same for us as well he did all they did all for okay all right we'll be on for that
087so um we're the schools have to go through an accountability um basically audit and it started if you remember at the beginning of the school year um the the then uh Town building inspector did a walk through um we've had to submit curriculum things and part of the process is also um a doe facilities uh audit inspection so a a member from the doe um excuse me education department um uh came down yeah they changed the order of the word so now it's Ned Hampshire education department um great facilities director came out did a walk what kind of stuff are they looking at do you know you don't know we'll find out everything for us they looked at everything from the building like climbed up in the ceiling looked at what we had in different
088places they walked around and they took a look at our parking lot they took a look at our Windows they they took a look at every piece of our building and the gentleman that I spoke to today was talking about how it was for occupancy purposes that we'll get that letter of then saying that we are okay allowed to be occupied for the next five years um based on what we gotta the condition of the building yeah I'm really interested in Griffin five years huh all right well thank you again for facilities of course you're welcome to stay for the board meeting um really appreciate you joining us tonight uh next on the agenda is program of studies approval uh am I turning this over to Dr Taylor I so um we have um B
089and Jake like we talked about last week um they're just going to present um the courses that we went over last week and kind of the changes to the program of studies perfect great welcome thanks um so we provided the board with the program of studies change sheet that has been provided in the past and the draft um program of studies um not many big changes this year are typicals um Jake's letter we added all the new courses that y all approved at the last board meeting um we updated some course titles so art of songwriting is now called literacy through music um that was probably the big one there is one error on the change sheet it says on on page 22 we removed honors Algebra 2 we did not remove honors Algebra 2
090we removed honors Algebra 1 um so that's an error on my end um that I missed and people were freaking out about today so I don't I'm like I don't know why I wrote that and then I looked I was like oh supposed to say Al honors Algebra 1 not honors Algebra 2 um so we added all the new PE courses that um were recommended by the committee approved by the committee and approved by you social studies courses and descriptions the new art courses we changed the name of crafts to artisanal designs so it incorporates more things um we added the sports entertainment marketing course and then I added in the Pinkerton Academy CTE courses that are available to students um alv has made some changes to what they're call again what they're calling some
091of their programs so I'm going to have to go in they just did that recently so I have to go in and just change the names in the actual program study so that's not updated in the actual program studies right now but the programming that they're offering is still the same they just changed what they're calling it so and I remember my first year when we did the presentation for this we talked about having a little bit more flexibility with making changes to the program studies coming and asking but then making changes after this meeting for instance my first year for half the year the letter was still from the former principal that sort of thing so like as we get new courses approved or we get the updates from CTE and that sort of
092thing is that something that you guys are comfortable with saying we say hey we got this can we add into the program studies then being a a living document in that way from there I don't see an issue again no big changes shock in the world no especially the things that they're talking about like the CTE the alv CTE thing is a perfect example they're going to tweak languages the big thing with uh like you I'm assuming this may have been I don't know for sure correct me if I'm wrong but one of the reasons why you have to change course titles sometimes is for NCA approval because there's certain titles they don't like and they'll change on you what they like and don't like right so as you submit the courses for NCA approval
093keep real yeah and like art of songwriting some students may have signed up thinking that they were actually going to be composing songs not necessarily analyzing lyrics and meaning behind lyrics so we said we needed to shift that so they don't think they're in there you know actually composing right with musical notation so um that was one and then crafts they just wanted it to embody more like metal work and jewelry making and kind of Stu so they were good they were good good little title change change edits all right so you're looking for a motion tonight I would love a motion cuz we're getting ready to roll out teacher recommendations and then get into classrooms and do course presentations and head to the Middle School um just to so people know so it's on
094the record we have our um 8th grade parent night on sorry the 11th of February at 6:00 p.m. at um Campbell in the auditorium just to go over the course lecture process what that looks like Mr cutter you'll be happy to know we're moving back to paper forms for the eighth graders this year um so we will have a paper trail of make sure parents are seeing it and looking at it um so we are that's in the works right now um yeah so that's 8th grade parent night February 11th 6 p.m. I will make a motion to approve the program of studies uh with the flexibility to the administration to make the minor changes is needed second second motion by myself second by Mr pansky third by Miss Harrison fourth by Mr good um
095additional discussion we'll do a roll call vote Mr plansky hi Mr Shoemaker hi I I Miss Harrison hi and Miss SES you have a 5 cool thank you all right thank you very much appreciate you coming in feel better Heidi thank you all right I know know we just met last week but we have the student representative report again this evening I'll turn it over to Nick and Danny oh it's it is snazzy tonight look at this guys lay so winter sports are going good boys basketball is 9 And1 and have a game today against St Thomas aquinus girls basketball have a home game tonight against St Thomas aquinus and our 2 and8 Boys Hockey are now one six and one have a home game this Saturday at 7:30 winter track has a meet at
096UNH on the 26 and wrestling has a try meet tonight at [Music] CER um not much has changed since last week but just yesterday student council had a semester one reflection we met from after school till about 4: just like reflecting on like what we've done as a council and our like advisor and our officers and like just seeing what we wanted to change and we end up getting food at the end [Music] here we go so we're still doing the acceptance cougar Paws outside the den for like plans After High School boys basketball has their senior night uh on the 24th and GMS is currently putting on their Beauty and the Beast play some of the future activities we have are still our Valentine's Day activities on the 13th of February we're going to
097be doing strawberry dipping where we give those out to students during advisory um we also sell carnations at lunch and then do the drink cart for the teachers like most times and then at the end of The Winter Carnival week we have a pep rally that we do and just student life just wrapping up the end of semester 1 that's at the end of the week the start semester 2 is start of the next week after that February break is the 24th to the 28 of February and course selection for next year is starting to come up during semester two so here we go yeah I know went by fast semester one jez okay Lots exciting things going on in the district thank you for the update that's it all right that's it any other
098updates from yourself uh no great around well spent a lot of time with the middle school today uh I think I got every classroom today correct at the Middle School Miss two or three no it was wonderful stuff going on uh instructional wise today at the middle school when we were popping around doing some temperature checks and other things uh I got the sub last Thursday I heard yeah there go yeah you I was in class uh the kids didn't eat me up too much so that was really nice but um yeah the schools are going really well right now so awesome appreciate that um moving on with our agenda tonight we have Community comment on agenda items this is the first of two Community comments I'd like to open it up for the community
099to address the [Music] board Mr peoples name and address please greetings salutations from the great north than you H lots happening at State House according to what I see online a lot happening um we heard six bills yesterday we did do one bill last Thursday which was the Educational Funding accounts uh we started taking testimony at 1:00 we finished just a little before 6 o' people for and against as you can imagine um that hasn't come up for a work session or for um a vote yet but I'm I'm anticipating that it's going to happen pretty soon since there is a bunch of early bills that need to be dealt with between now and the beginning of March um I would urge you guys to go in and take a look at the bills that
100are there there's 32 be uh before us already in the house Educational Funding committee and I haven't even looked at the education policy committee I know that they had something to the tune of like 120 is what I heard I didn't look at that um uh we heard one bill yesterday HB 550 that would have brought the education funding amount up to the court ordered number for your base base U money um don't know where that's going we spent a last Monday at the doe or if that's what we're still calling it department of education learning about school funding in general we started at 9:00 in the mo the morning and finished about 4:00 in the afternoon and all I can tell you is it was a deep dive into something your superintendent has to
101do all the time I hope never have to swim in that water again um I I would just urge you guys to all take go in to the the website take a look at the bills and read the titles to see if any of them you think are going to impact you greatly or not some of the bills have uh start dates in them one I looked at would be in effect April 1st 2025 which is right around the corner so if it gets voted yeah it would it would be almost effective immediately okay so I just um uh things that are kind of high notes in there there's a bunch on school aid there's um uh School building Aid which is going to impact you as you move forward there's um a lot in
102adequacy as well so right now there's several bills on adequacy alone and I know how that's all going to play out until we hear public hearings and work sessions on them because we haven't even seen some of them they're still in the legislative service office so there's that 37 that's there there's more coming so that's all um if you have any questions you know reach out to me like I said um I'll try to keep you informed as much as I can like I said we've had those public hearings and um more information coming really appreciate the update what's that which website are you talking about if you go on to the New Hampshire General Court website uh go to standing committees uh house Educational Funding okay thank so there's uh and there's a bunch
103of committees out there and you know um like I said they divided education into two so now there's two places so they're trying to sort all that out this is all new to them and us so thank you for the update than for the update it's really nice that you come and update us we have our meeting Monday from the superintendent level up in conquer where we go over not every single bill but like probably the most prominent or most It's Kind yeah the cliff notes of it all so yeah cliff notes for I need those too well appreciate the update appreciate all you're doing um and thank you for the online updates as well those are really important I'll I'll try not to make them so controversial I have a habit of doing that
104I'm afraid thank you all right with uh with that we're going to close the first round of community comment um move move it over to correspondence Miss Ames I know you're a bit under the weather I'm not sure you had a chance to pull together correspondence tonight I did did okay you're on top of it so I'll turn it over to you thank you January 16th [Music] January payable manifest on January 17th board Circ the agenda can you hear me okay uh yeah we're doing okay yeah we're doing okay put it up to 0 it didn't work so we're good okay well Jan puts this in the minutes so if anyone wants to go see our minutes after they're published this we be right there oh here we go oh there we go it's a
105magic volume button somewhere all right thank you we're good okay um there were the two manifests then Renee emailed us the agenda on January 18th Mr oenis emailed the chair copying the Schoolboard requesting copies of the Lea and lssa contracts and those were provided by Mr C on January 21st canel an email the board circulating the drafts uh January 15th public and non-public minutes and then today there were various updates to those drafts that were circulated and on January 22nd the superintendent emailed the board asking if the board would like hard copies of the on-site Insight reports for the evening all right excellent that's all thank you very much for the update appreciate that any other correspondence by the other board members nope hearing none uh we'll turn it over to the superintendent for an
106update tonight um yes so mine's pretty brief because we we've talked about a lot of stuff already um so the first thing that first link there is just uh updated warrant articles we finished the voting up from the budget hearing um last week so this is where all of them stands uh right now uh Julie's been putting them in the um the portal yeah the Dr portal uh for preview so they can tell us that we're in good or not good shape but we've we've brought this by our lawyer so hopefully we are in good shape um and so nothing has changed on these articles as is right now now the next thing in my kind of follow up that next bullet possible article 9 revision so we talked about solar we met with K
107uh yesterday as uh as chair cutter alluded to or stated um so we're looking at maybe adjusting uh article 9 a little bit here um so it it better reflects and gives us a little more flexibility in terms of how to oh you can't shoot I got to share this one up there excuse me uh there we go U but you should see it on your screen on how we can maybe uh utilize this fund with a little more flexibility so um we have the current article as it is I'm just going to read uh what a proposed language is this does not have to be the final language uh we sent this to the attorney today to kind of get their uh their feedback on it um because again we're establishing um this trust
108fund and everything so shallow lfi School District vote to establish a capital reserve fund under the provisions of RSA 35 column one to be known as the solar array fund so that was our first adjustment rather than to call it the solar array purchase fund to just call it the solar array fund um to allow more a little more flexibility in its purpose uh for the purpose of accumulating funds to acquire the solo equipment at the Lichfield Middle School at the end of the six-year agreement and the fund maintenance and repairs of solar equipment in the Lichfield school district and to AR an appropriate up to the sum of $100,000 to be placed in this fund with the sum to come from June 30 fund balance available for transfer on July 1st of this year
109for no additional amount to be raised from Taxation and further to designate the school board as agents to expend this fund majority fot require so we need to revote on this um this is some different language we can talk about if we want to make even further adjustments to it right here but this is a starting point if we want to tweak it a little bit so either way this will need to be revoted by the budget committee because there was a discrepancy um between what we voted on as the school board and what the budget committee voted on just with some of the wording of the article so we're trying to take this as an opportunity to refine the language anyways because it's going to be revoted anyways um so notably just a couple
110of the words that you're seeing here we added the word maintenance y uh and the language that the Buddy the budget committee asked for which is up to yep uh has been included I'll make a motion to recommend the amended language for well I might pause one second before you recommend maybe we can well we can recommend it maybe we can discuss discuss it okay second motion by Mr Shaker in a second by Miss Harrison discussion one of the things that if you don't mind me me jumping in uh with the six-year agreement I don't know if we want to have a little more flexibility in defining of that um so one of the things kind of batting around I put it right down here so I'm just going to read um maybe we could
111change it to something like as defined in the terms of the power purchase agreement approved by the Lichfield School District so I was reading this earlier today and I I want the language to be a little bit tighter yeah around that because I feel like it's just open-ended and I want it to be very I want it to be referenced in the exact contract right and I and I feel like it should tie to the exact contract and the date of that contract yeah so if you change something as defined in terms of power purchase agreement approved by literal school board on 1423 the specific date you approve that contract um that has this agreement in it and in it there are specific terms of how the purchasing goes right we've talked about 6 years
112but actually within the contract you have options at 610 and then 25 as well and we've amended that contract and we've amended it as well so um like you've added to it it there was the window that they weren't delivering stuff on time so it got pushed forward we might be looking to amend it a little bit even further you know we verbally got that from K we got in rating last week verbally from K uh yesterday today that we can get this into the next fiscal year um in terms of when that contract could start um regardless of when it it is turned on right so if it's turned on you know say hypothetically March 12th the day after voting right well we're kind of you know that kind of ties us a little
113bit you know but if that contract doesn't kick in until FY 26 it gives us that full fiscal year restate what you said what your suggested language was yes so as defined in the terms of the power purchase agreement that's what the contract is called um approved by the Lichfield school board on uh 1423 January 4 as may be amended or as amended as amended is that the actual I just want to confirm because I couldn't find the actual signed contract with the date I have it okay perfect as long as you have it I'm I brought it with me tonight so it is signed it it was signed by the superintendent on January 9th but there is a note specifically on it says approved by the school board on that date 1423 and it
114is called purchase power purchase agreement I did not pay the specific company you signed it with because they've changed names I didn't want to get into all the weeds on that type of stuff and and we send we're going to send this to the attorney again um depending on how this meeting goes if we adjust it or anything like that so yeah so they still have to review the language for this new one yeah oh so we shouldn't even vote on it tonight then right no we should because our next me if they what if they change language again our next meeting is February 5th and the town deliberative is February 1st and that is when I believe the budget committee is voting on the remaining articles for both town and school all right so
115we're going to vote on it and if they have any changes to it we have to try to deliberative session to vote on the school I don't know if they're I I know they're voting on I don't know that I I know they're voting on the police station after deliberative on February 1st I don't know if they're voting on the school article that day or after the usually they wait till after deliberative in case something changes on the floor they schedule that that makes sense actually last time they did not announce a meeting so you may want to remind them to do that they have to post for a meeting after deliberative all right so I'd like to amend by motion I'd rather do it today for yeah yeah yeah no I'm I'm in favor
116I'd like to amend my motion to include the language that you just said with as amended at the end of it could we so if you could just read it can we read it one more time so it's clear for the minutes yeah I'm not an attorney so if anyone else wants to jump in here who is smarter than me and amend any part of it be hiding so do you want me to read it with that adjustment in it yeah okay here we go the proposed language would be the proposed language would be shall the Lichfield School District vote to establish a capital reserve fund under the provisions of RSA 35 colon 1 to be known as the solar array fund for the purchase for the purpose of accumulating f funds to acquire the
117solar equipment at the Lichfield Middle School at the as defined in the terms of the power purchase agreement approved by the Lichfield School Board um 1423 as amended and to fund maintenance and repairs of solar equipment in the Lichfield school district and to raise an appropriate up to the sum of $100,000 to be placed in this fund with this sum to come from the June 30 fund balance available for transfer on July one of the year with no additional amount to be raised from Taxation and further to designate the school board as agents to expend this fund majority vote required this may be nitpicky but I I might I might change um instead of as defined in I might change it to in accordance with yep and you had mentioned as amended I don't know
118whether that makes sense so if it's been amended right so when when we're making reference to the original signed do if it's been amended we want to do it in accordance with it as it's been amended so that happened after the signing was changed after the signing and it may be further amended okay because if we don't say as amended then we're really being authorized to comply with the terms of it prior to it being amended the original language that was approved right do you agree Heidi was it they just referred to it as an amendment so I have it in my office I didn't bring that one with me um I think it is an amendment yeah I can look tomorrow morning yeah that makes sense to do it I just want to make
119sure it's in line with what we have called and may call future any subsequent changes to that contract that was like one of the first things you signed as superintendent that I signed isn't it no it was before me before you yeah I have a copy of it amended my desk Spelling's not I'm a MTH so you said it may be what it me you said it may be amended again potentially yeah yes so I want to make sure we're protected against this like my fear this is my fear this gets voted down by the voters on March 11th right this thing gets flipped on and we get all our storage on say March 15th and then the contract Clicks in there but we don't have that additional year of funding in place for it
120right I wouldn't say it's a fear it's not like we're like in the worst shape ever but it just buys we need something out of this thing this thing's been delayed forever and ever right like if we can at least get the insurance that we can get into our next fiscal year here when we talk about from a budgetary standpoint it just gives us extra buffer room to acquire the money if we're going to go down this road of putting it away in a fun it was signed by you and it was signed July 24 was one of the first things I had sign it was one of the first things I signed sign it all right yep it was um those first two weeks grid schedule memorandum it was rapid does that say anything
121about when the the purchase would happen no it just refers to the original Power purchase agreement okay so I make this that's why I was thinking as amended that don't Mak sense we don't need to refer to that addendum necessarily correct can you to see it that make sense yeah was it just a new agreement it was it was I I had asked for the amendment because all the dates were changing of this energy storage system and I wanted more commitment from K on when we're getting this thing and I just didn't want it to be loose ended right now it turns out this didn't mean anything anyways because she didn't deliver on that either so Brian that should be in accordance with in accordance with so yeah so I I guess the way that
122I'm reading this is that this that they're clarifying the terms they're not amending the terms they're clarifying that this was actually the way that the the contract is written but I still think that if there's a potential for this to be amended which by the way if it's going to be amended it's going to be amended in our favor right like I just want to clarify that if people hear us talking about it being amended um so maybe instead of as amended as may be amended just because we want to cover if it gets amended we don't want to have someone say that the wording any future amendments I'm not you just say as may be amended as may be amended scho dist but if an addendum but it won't be an addendum if it
123changes material terms in the original agreement it would be that would be an amendment another words are important well this doesn't matter this one I don't think this one matters I don't think we need to say as amended for this but I think that we're hearing that it may be amended so we we would want to be able we would want to have the warrant article cover that if it is the case I mean granted it would be amended for our benefit but nonetheless [Music] what I think it would be an amended to the original contract I I would just say as maybe amended yeah inad of again all right words okay so in accordance with as may be amended all right take two all right would you like me to give it a shot
124this time no I can do it here we go y get maybe we should have the student reps read it you know all right sh thefield School District vote to establish a capital reserve fund under the provisions of RSA 35 colum 1 to be known as the solar array fund for the purchase of accumulating funds to acquire the solar equipment at the Lichfield Middle School in accordance with the terms of the power purchase agreement approved by the Lichfield school board on 14 23 as may be amended and to fund maintenance and repairs of solar equipment in the Lichfield school district and to raise an appropriate up to the sum of $100,000 to be placed in this fund with this sum to come from the June 30 fund balance available for transfer on July 1 of
125this year with no additional amount to be raised from Taxation and further to designate the school board as agents to expend this fund majority vote required I like it okay I amend my motion to recommend that Mr sheaker second second by Miss Harrison additional discussion Miss Ames you good with [Music] that that can be covered by this language okay that's fair sounds good all right that's fair all right job lawyers roll call vote Mr plansky hi Mr Shoemaker hi I'm and I miss Harrison hi and miss perfect that's 5 Z all right so is that our vote on this article that is a recommendation by the school board 5 good just put in the amendment wasn't it no I made a motion to recommend it all right and I seconded it I should have I
126recommend it too cool okay there we go perfect and that's all I got all right we'll turn it over to miss darling for a business administration St all right I also don't have much on um for this meeting as we just met last week uh don't have any transfer requests um we the only update I have is the solar um but we've already kind of talked about that topic of the evening tonight yes it certainly is um so just as an update we do have um two components that will be installed in the next couple of weeks um and then we did discuss the fact that um when we move into into the testing phase which will happen after that um that to air on the side of caution we would do that when there
127are no students in the building so we'll do that either in an afternoon um that they'll come in um or they can do the work on the weekend In fairness just on that point again with um the four of us in the room talking to K right um Kay did um agree that the the system could be turned on and activated earlier than February vacation um K was very very confident that it would it could be done with the building occupied I had reservations about that and I said time out with all the issues and delays that we've had with this thing I did not feel comfortable with that direction and I said after school hours right weekend February vacation let's make sure the building has low occupancy to no occupancy when this thing is
128fired up so that's why good call it'll be it might be a little bit later look we waited this long we can wait an additional too right so he will arrange that with the fire department um and with eversource and with all the parties that be to make this thing operational was there other discussion about timelines beyond that other discussion was Kay had an action to send us uh warranty information uh and what else the warranty information was a big thing I haven't dug through it but she did send me a bunch of that yesterday maintenance cost main main cost solars correct there's no update on the battery storage so uh yes June is what she told us yesterday okay any other questions any questions for Julie no thank you okay okay I do know
129okay we will move into the minutes from January 15th I know they were just recently um tied to today's agenda has any everyone had a chance to review them do we need more time I reviewed them I did okay I'll make a motion to approve them motion by Mr Shoemaker second second by Mr plansky discussion we'll do a roll call vote Mr plansky hi Mr Shoemaker hi I am an I Miss Harrison hi and Miss SES it's 5 Z as well all right new business there's none listed on the agenda any new business to highlight NOP all right perfect there's old business and none list on the agenda any old business nope perfect love it school board comments oh I just had one kind of piggybacking off of um representative peoples um for the board
130the New Hampshire School Board Association sends out uh a regular update of legislative bills that they're tracking um and they I think they have a tracking tool on their website as well so you can go oh great go there and they are um they're listing the bills and you can click on links to to register your testimony if you'd like oh that's great that's helpful yeah it's nice to have it all in one place yeah thank you for sure MH um great uh the Manifest has three signatures uh and then the Manifest overview from last week January 15th two items to highlight for public awareness we had the accounts payable manifest for $341,900 which was also board approved uh with that we're on to our second round of community input this evening uh we are
131now at 7:30 before 8:00 time so I will open it up uh to community input all right uh I see nobody running up to the mic tonight so we'll close Community input uh and with that that closes our uh public meeting this evening we are going to move into non public session under RSA 91 A3 specifically under uh A and C a couple items to cover off tonight in non public uh we thank everyone for joining us in public session especially the members of fic for joining in tonight and with that I will entertain a motion to move into non motion by mrch maker second by Mr plansky go call vote Mr plansky hi Mr Shoemaker hi I I Miss Harrison hi and Miss Ames all right we are now in um public thank you
132very much have a great evening thanks everybody