CorpusRecord 95252

SAU 84 School Board Meeting 12-16-24

A searchable transcript preserved as part of the Discourse Corpus. Passage numbers provide stable references within this record; verify quotations against the original recording when available.

Source
YouTube / SAU 84 Meetings
Date
2024-12-17
Location
Grafton County, NH
Material
Transcript
Extent
5,989 words · about 34 min
Collected
2026-06-12

Transcript

Verbatim source text

001okay it's 5 o' will callist meeting of school board order will be given with the pledge of aliance pledge allegiance to the flag the United States of America the rep for it stands one nation God indivisible and justice for alliss from the board I would like to deviate from the agenda as presented move right to new business item a the Lakeway renovation presentation from George hearing no objections George okay we have a speak up do that work yeah it's fine okay thank you good you mind if I stand no not at all okay um we got some slides here uh these slides so there's just the school board okay I thought that there would be reporter in TV here at the time he tends to watch on streaming it's on YouTube and it's recorded perfect

002thank you yeah he tends to watch it after the fact thank you for pointing that out to me okay first of all thank you for allowing me to speak I originally had scheduled to come here and speak at this date uh thinking that the news school is going to go on the ballot again and number two thank you guys for being considered not putting the new school choosing not to put the new school on the 25 ballot uh years the town's been voting down new schools it started with a new high school on the Greenwood property property they chose to renovate this building you're sitting in now then there was the eaten property and then there was the green property again and most recently the nuns property the town's got a history of voting down

003new schools uh mostly because of the cost a lot of it is because of locations they're choosing they're picking these side streets in neighborhoods for schools uh the town does however have a history of voting to pass Renovations uh there's been there's been this school here and a number of Renovations done at Lake white and that there's been another couple renov done here with the middle school going on and the vocational Wing going on the town doesn't seem to have a problem adding to the existing buildings in their current locations what I'm what I was going to point out is this summer I spent some time I was given some documents the Warren Street report and then there was some uh architectural renderings done by Banwell in I believe 22 well after I got done

004reading these I I was afraid what was going to happen was I spoke last fall last winter against a new school I was thinking to myself Gees you know I really hope I did the right thing and much of my surprised when I read the war Street report I was amazed that all the answers were right there everything was in that report they did in 2017 now there were a number of deficiencies in that report when I was allowed to go in the school this summer I realized a lot of those deficiencies since 2017 have been addressed boilers hot water heaters some piping some air conditioning units things like that and they should be addressed when something is not right if the roof leaks you fix the roof if you if you need a new

005boiler you get a new boiler all those things the town the growth of Common Sense has absolutely zero issues with taking care of take care of your property it will last and it's it's evidence so in the war sheet report on the first page do I do I click this thing to make that pop ahead how are we advancing slides are the clicker yeah clicker okay so basically the Warr sheet report there's there's the cover page of the Warren Street report if you would like to hit the clicker again my my best part of the Warren Street report was when I got to this part the conclusion they have three options number one option is the renovator over a fiveyear period and I'm like wow this is right here I I was led to believe

006that renovating was too difficult given the logistics given the area given the space second option was to renovate over a one-year period which cost a little bit more money understandably and the third option which they did say they did recommend was to build a new school the issue with building a new school is the expense and they did say that in their conclusion if you could cck ahead two more they did say in their conclusion thank you the expense is the issue now last winter when I spoke uh there was some disagreement when I said renovation cost approximately 60 to 70% of the cost of new construction I I guess the uh general contractor that was uh being used at that point Bonnet page and stone said that it was going to cost more in

007this report in 2017 they gave estimates on the previous two pages and it just so happens the new construction is 30% more in cost than the renovations so that helps clear it up and I also did it you guys can do it as well at home or anybody can do it at home you simply can Google cost of Renovations vers new constructions my my my goal here tonight is to help the board push the board challenge the board to look seriously look into renovating Lakeway now how would you do it well once again in the warrant Street report the report I got were these drawings from 2022 done by vanwell there was three options in there they show parking up back they show additions on that that's that happens to be the first floor they

008show second floor additions they show some freestanding buildings and the best part they did was they gave you a renovation a proposed renovation schedule and that was the biggest Kickback I was getting was well this can't be done where did the kids go blah blah blah there's a threeyear span and it's right in that report the answers were all there yet the committee chose to go with a new school uh it's my opinion a new school is not going to pass now that's my opinion but it's also the opinion of many many people in this town many people that did not come out to vote last year when the school was on the warant article if you're going to solve this problem you're going to need to to renovate Lakeway Elementary at its current location

009you've got the infrastructure water sewer you've got the road Union Street has a 100 foot wide RightWay right there you've got the land up back for parking and rumors of flying around town that this property may be coming up for sale as well now even if someone was able to prove beyond the shadow of a doubt that this still isn't enough room there something I wanted to point out while I was here tonight is there is a possibility of mixing which is one of the other things I'm hearing people talking about some of the campus up to the high school facility something everybody needs to know is this addition out to the hallway all the way down through and the addition they put on oh God I don't know what's in there anymore when I

010was in school through the math classrooms right down this hallway to the left that structural is all prepped with Bolton columns at the top of the current columns it's been sized to receive a second Story the door at the end of Mr Joyce's Business Law class 1979 there's a window that can be demoed out and there's the nury Collins office 1979 again is another place that was all looked at when the renovations were done in this hos in this hospital I guess excuse me this high school so without counting them you got one two three four five six seven you got seven or eight classrooms right here with a simple addition on going up I think that would handle a sixth grade maybe a fifth grade with some of the other vacon areas here let

011me just check my notes that's it I I thank you for letting me speak uh I urge you to go after the renovation because that will solve the problem there's a lot of history with that school down there there's a lot of people in this town that feel it should stay there and I hope your building committee either the current committee or a new committee can put together something for 2026 and we'll get this behind get this behind the voters and get moving on it thank you for your time thank you George very much can I ask you a question or absolutely so from your perspective I know you have a lot of experience in this space the issue as I understood it with the 70% P was that that's true when the overall footprint

012of the the facility the building the house the whatever is staying the same you're talking about the warrant the the the the proposal from 2017 with bw's proposal from five six years later calls for a relatively dramatic expansion of square footage on the existing property does that or does that not factor into that 70% rule of thumb the 70% rule of thumb which was proven right here in this building we're in includes all new electrical all new Plumbing all new HVAC most of the petitions in here were curtain wall block petitions they were demoed steel stud drywall petitions were put up all the windows in this facility not this this is a new new addition all the high school received new windows new Cabinetry new New Heating units that is a renovation basically you're left

013with your foundation your exterior walls and if you need new roof you do new roofs the Middle School re I'm getting ready to tell a lie they did not they did not receive a new roof they should have received a new roof above which used to be the old Middle School Wing there six classrooms over there so the 70% is gutting and redoing everything but if you're building if you're expanding out square footage that's going to be an additional cost to that 70% that's right absolutely H what's the square footage Edition that that bwell was proposing for Lakeway on the r out side roughly around yeah which is small compared to the rest of the building that's there that's where you get a number so we were seeing obviously as you know numbers that were

014roughly comparable with new construction yeah and the argument there was yeah you're you're keeping obviously the building and you're going to gut it you're going to redo everything just as you articulated but you're also going to redo the floor plan and do and do an an extension or an addition and when you combine those two things that's where you start to get a number that is approaching More than 70% of the new construction budget does that does that make sense to you it it does make sense that you didn't have the right contractor there are are contractors that that will make that all happen uh and I'm still a firm believer you have the property you have everything there you have all the logistics you have you have the concrete in the ground you have

015the infrastructure and then you're not going to have to run the infrastructure upgrade the infrastructure through town I don't care if it's the nuns the Eaton or the Greenwall you still have to increase the town infrastructure down through now that's probably less money than putting up a new building uh but at the end you keep a lot of people happy too because the school's there and as far as doing the work while the students are there I don't see an issue with that yeah there's going to be a couple hiccups of course there's going to be but with some planning with smart people it's certainly could be done we did it I was I was here the president we had hiccup we didn't St school on time one year we were a week late the

016only person that was mad was my boss the teachers and kids I was I was a hero but it did happen and that was all structural steel eight weeks before that that was delayed dur during a drawing checking process you know we just didn't have enough time that summer to get it quite ready I'll open up the additional questions I know we have members of The L committee here Henry Henry good are you say I'm not I'm not capable of saying if it's a good design or not because I honestly don't know I haven't sat down I haven't seen the criteria what is actually uh there's a lot of things that could be done that design there were two options and both of them as far as I was were fine these people have put

017time and effort in to trying to fit the needs and the suggestions you know here's worst case scenario I want I want to somebody else pointed this out to me I was not clever enough to figure this out so here basically it's touchreen we didn't have that in 1979 so so basically there's the building correct and you see the yellow and the green and some stuff coming out in the front here that are additions if you took the existing structure and left it right there for three years there's enough room back here to build a brand new school on the same property then you can demo this one and there's your parking that was just another simple suggestions that came up came from a Yankee that's like wow why can't we do that you know

018there's there's so many options you have and you don't even have to leave that area then that building is in pretty good shape that was another thing that I commend the maintenance crew or the people that are in charge of keeping the building that building's in pretty good shape it's just not brand new that building is in better shape than Littleton high school was when this was renovated 18 years ago when we came in a little in high school I was surprised how poor it was but that building's in much better shape now I know there are some issues on the second floor they I read it in the structural report some bi Joes some disconnections and stuff but that's all things you do when you when you renovate that Wing you just go in

019you rip the ceilings out and you go through and if you have to add B choices you add them you you cut it you cut it into the block the low bearing walls and you make a seat and you put a new B joy in you put a struct being that's all stuff that can be done relatively easy Once the area has got it out and cleaned out but as far as is if that's the answer I don't I would know that so so you you say you can do that work the kids in the school how so they have it right here on the read read right I'm sure you have so so for instance what what we did here at this school and you could do the same there you build your new

020buildings you build your new new addition you then put the students in the new addition so the new gym may not be a new gym right off the bat or the new music room may not be a new music room right off the bat it may be a classroom to temporarily house students for nine months until the renovation is done on a wing you don't have to do the whole thing you could renovate the interior po first then renovate this part second move out as you go and you are going to gain some space one of the things I read that the stairwells are too narrow so that's really not that big a deal you demo the stairway out you add just like we did with the elevator when we put a new elevator at

021Lakeway what 10 12 years ago we added a small building ped a footing and went right up two stories you do the same thing with the stairway you pour a footing Frost wall footing You' put a structural frame with a 2X steel stud infill whatever sighting you wanted and you just be wider than what was there so the hallway would be extended the length of that steel whe another 20t or so yes how do you how do you safely stage your construction while you have students in that school have so you have areas like I just said you have areas and you plan it out ahead of time because someone has to sit down a club person sits down and they just figure out this is a new area we've built this area gets renovated

022no no students are allowed in this this area and if you have an area of high traffic you can't get around it you do like they did here at the school you the the main area let's say let's say this main area right here is is an area that there's going to be traffic in you knock the crap out of it during the summer you get a couple weeks head stock on one end and you might have to squeeze out a couple weeks on the other end but you can get three or four months in there and then a renovation basically you're gutting putting Windows putting Heat piping uh lighting electrical you're running all that stuff then and it's it's all hands- on Deb and that's what we did here at the high school so

023last year at delative you said number 15 million the renov this school was 12 million no renov oh I wouldn't have said 15 million if I did it was because it was it was uh 60 to 70% of the cost of a new school anticipate that renov I couldn't tell you I'm not in the business anymore but that might be 20 million maybe 22 it's still a heck of a lot it's still 12 million less if you give the voters an opportunity they're going to take it do you agree that the parking goes up in the back I don't see a problem with that and if the and if the uh property to the uh East becomes available that's that's a that's a no-brainer to purchase that I think part of the perspective to of

024the committee and I think there's a million different ways to look at it there are huge benefits to the existing property from this the standpoint that you articulated the infrastructure is there right it's established you're not going off some far off place and having rout infrastructure that way the other disadvantage of the property is it's the property right I mean you're you're never going to have a bigger property you're you're on top of the road as only so far back you can go and the further back you go the more green space you're taking away right which is as at least from the from our perspective and from the evaluations that were done in the educational leads is an important part of what we think the town would want to invest in in a school

025right so I think that's part of the limitation there's just not a ton of space to work with there one of the I I did notice on a couple of their renderings and this is one of them that does show well this really doesn't show the parking up top they a new entrance but if you took the ball field and you did away with the ball field you made the ball field parking and then move the ball field to an elevated site above you might have to walk up a set of stairs or something like that now maybe that would work better because then you wouldn't have 75 Vehicles every day communicating commuting from up here to down here you'd be going from here to here but if you had an event at the ball

026field the four months that they Ed the ball field and they could walk up there use the ball field that was just another idea there there's a number of ideas and that the amount of additions and the amount of everything that happens on that campus can become quite a lot smaller if a couple grades are move to this complex up here now I'm not an educator I don't know what fifth or sixth graders should be up here but there are a lot of people that our educated who believe that that is a very strong possibility uh it it's it's something to think about there's a there's a number of things that can be done in the next 365 days for let's just throw a number out there $22 million that will pass and it will

027get this ball rolling so gosh by 2029 this might be behind everybody it's going to be expensive there's no two ways around it but I honestly don't think a new school will ever pass I really don't and this is not to say that things that have been thought can't be thought again but I just want to clarify that we did look at bringing five and six up here oh no and I don't doubt that for second I don't doubt that for there some definite challenges honestly I get that I get that I understand all of that I really do I just you know we had looked at this renovation piece and maybe you say we got the wrong contractor I don't don't believe it I think they did a great job of pricing um the

028Warren Street you look at the war Street deficiencies never they didn't address replacing thees they didn't address uh upgrading the the infrastructure we the Water and Light andone none of that was considered back on war Street when they did it 2018 they didn't address any of the parking issues that we had they noted that in their report I don't remember seeing any of that in that report well it should come to mind because it's in there I'm sure I'm sure it is it is it must be and it wasn't just the Lakeway committee that recommended a new bill that was the leack committee back in 2018 after they did their study and they recommended a new bill well um I I can't see the town I personally agree with the town putting whatever you say

029is it's going to cost and I know you just you just throwing a number out there so I'm hoping that doesn't go newspap everybody million but but there's no room for growth where Lake is and and I'm afraid that you spend that kind of money now in 10 15 years from now you're going to look back and say why why did we do what we did where we did we have an opportunity for a beautiful site over at the DOTA of Charity that with potential for growth and I know you say we're going to be in the neighborhood um from what I can tell the majority of the folks that live in that neighborhood are find with the school going air except for a couple of dis russle individuals who I don't care what we

030do promise them was what the new school is going to entail what we're going to do to make that happy it's never going to happen so I just hate to see that this community miss an opportunity for the site that we have been given by by the any other questions or comments now that carries here can we BL the select board in some way and say it's all their fault my favorite thing any other questions thank you for your time George thank you very much appreciate it all right we are going to resume the agenda going in proper order now uh we're going to go backwards to section two and look for a motion to approve the consent agenda which includes minutes from the December 2nd board meeting is there a second second any discussion

031all those in favor I opposed obain motion carries 4 Z another note on the agenda that I neglected to mention it's my preference although you all can overrule me to table the votes on the policies because Erica serving as a member of the policy committee not able to be with us tonight and I would rather have those discussions with her than without her so you can think and pray on that as we work our way through the rest of the agenda let me know what you want to do uh we'll move on then to the business report uh section three yes the only things I have to cover are the budget in the warrant articles because we want to vote on all those things tonight yeah I wanted to get a for vote so I

032can print it on the Articles um I did attach the default budget for you guys to see the budget that we went over last week has not changed it's the exact same budget and the only other conversation um was to just confirm that we're going to have those capital reserve deposits on the warrant article okay so we'll take those votes when we get to new business section D but any questions for Patty on anything other than that before we get there all right we'll move on then to new business B program of studies for any actions I just presented uh the courses that we would like to offer this year we're still working on the complete program of studies which I like to come to you the last meeting in January for vote want to

033get students signed up for the next year um we did survey students uh regarding a lot of these courses so Our intention isn't to offer everything you see there but we're thinking about providing opportunities for stud students maybe every other year every third year so students could uh develop a more comprehensive transcript but changes that we are looking to uh towards just kind of again not looking uh for your opinion right now or vote by any means uh you may have noticed that our CTE programs if they're completers they have courts and so they recognize the graduation we've done that for a number of years the other things we want to do is we want to create an AC academic honors maybe create a 30 credit uh diploma we have some students that definitely have

034time in the schedule to do that that will be recognized at graduation on their transcript we have a regular diploma of 28 as we always have and of course you have ATM 20 um we've talked about dror solor for a number of years we going to keep that maybe do away with that we're looking to keep that we think it's right thing to do but we do want to Institute Latin honors we could recognize more students again just that that graduation and maybe something you noted certainly on the transcript or and also on the diploma what you don't see in those course descriptions we're still working on that and within our regular courses on uh offer an honors track so students could uh be challenged a little more in in in a class again be

035recognized um we do recognize AP in Early College we have a if you didn't know we have a weighted GPA which count just solely for class rank um that would uh certainly that on track would be part of that U way to GPA we're g to I'm going to come to you with uh more of a structured process approval process for online uh right right now the absence of uh an AP class or a college class that's offered through Community College any other um college class or online class is not part of the students way to GPA and so we have to take a look at that we certainly want our students to take classes here with our with our teachers uh but sometimes that is impossible because of conflicts and scheduling Etc so we

036just want to make that clearer and then uh I guess the big one if you will and this towards down the road so maybe the class of 29 as a graduation requirement doing a senior cstone project um which would involve doing something at the sophomore level and starting in really Middle School developing electronic portfolio that demonstrates students progress in academic areas and maybe some other areas of Interest as well so those are some changes that will come to you on uh hopefully the last meeting in January but just wanted to let you know those are the major things we're looking at and hopefully with those kind of raise a bar and uh acknowledge students who are really challenging the thank you very much for the brief any questions for principal Smith we look forward to

037seeing you again we can vote on okay uh we'll move on then to item C the support staff Mo MOA this is a uh document that addresses you know how we how we will handle if we have to go outside of this of this we hire almost every over staff par Educators other special education support staff we hire directly uh sometimes we end up with situations where we can't fill the position we can't get candidates or it may be or it may be that we we can't get candidates for the parameters that we have like four hours a day or something like that uh so at times we do have to contract out uh with with service providers but as the mo MOA clearly indicate that's something that we don't want to do we want

038to do that as a last resort and and fiscally we absolutely want to do this a last resort because it's more expensive you know so we don't do this lightly but uh in order to make sure that we have an understanding of how we're going to handle that and we're not going to use this as a way to skirt uh local hiring uh uh the mo MOA is is a is a way to address that uh Mike Mike Elwell did uh did Proof the MLA did give it his Blessing obviously it wouldn't bring it without that happening so uh it would require a vot of the board and a signature by m with other negotiate agreements it okay so what questions do we have on the m so then we're looking for a motion to

039approve the support staff as presented by the superintendent is there a second second any discussion all those in favor oppose was it bill or oh Bill me all those opposed staining motion carries 40 we move on then to the budget and the warrant AR so technically speaking than you Mo a i chance thanks um technically speaking Pat is it true to say we can just go through all the Articles and that will suffice because that also includes the budget yes okay so we don't have to vote on article one because that's just the election themselves the draft warrant is in the business section of the folder that sheina prepared so we'll go through the articles in order the so the first article will take up is article two which is itself the budget so just

040to clarify this warrant as written includes the the one hot button issue that I'm aware of Still Remains this includes the funding for The Residency program with the district funding two positions and there be match funding from Project Mountain that would fund the other two correct so the if a motion is made seconded in this passes the board is essentially approving a budget that includes that expense and everything else that we've talked about right so the reduction of three headcount perspective I think one one administrator to staff um all the different things that we talked about it includes also the um increases assumed by the CBA but the CBA is itself a separate warrant but the board's already voted on that but we'll vote on that again for good support So any questions then on

041the budget okay then we'll look for a motion to approve article two I'm sorry let me rephrase we'll look for motion to approve article two sorry let me try again we'll look for motion to recommend article two as written motion is there a second second any discussion all those in favor I I oppos I obain motion carries 31 for a motion this is kind of profun we've already approved it but a motion to recommend article three as written that's the collective bargaining written for the teachers which the board already ratif 55 is there a second I second any discussion all those in favor oppos stain motion carries 4 Z Erica is really messing up our ballot by not being here uh we'll move on to article four the special meeting if the support agreement is

042defeated look for a motion to recommend that article as written any discussion I'm sorry is there second second any discussion all those in favor I I I opposed same motions cares 4 z uh Article Five then the transfer from fund balance to District equipment this is the appropriation of 50,000 I we've done this for a while now this is the new one this is the equipment we've been doing the facilities um but the facilities has dropped significantly um because we've been using it that was the purpose um so we're asking for 100,000 to go in that one and the equipment line will more than likely be almost depleted this year um so we'd like to put 50,000 in thatal reserve fund okay look for a motion to recommend Article Five that's written moved there second

043second any discussion all those in favor I opposed estain motion carries score zero trap 7 I think he yes I sorry getting old my ears are failing me uh we're going to look then for a motion to recommend article six as WR this is the 100,000 fund balance for district facilities was to speaking to Second any discussion all those in favor I I I oppos obain motion carries for zero and now the ultra Ultra controversial article seven to extend the clerk moderator and Treasurer CHS from one year to three years as discussed at the last meeting looking for a motion to recommend that article that's written motion second any discussion all those in favor I oppose estain motion carries 4 z i I think this what we needed to do yeah and I just want

044to let you know that article 7 after doing some research the town is allowed to separate those three positions and change the terms but the schools it's all or enough they all have to have the same okay so that's why it's different from last week but I figured that was the direction we wanted to go anyway so and somebody who wants that position but two years into it or a year into it can't me they can resign can so okay yeah so just so you know that was the only difference compared to what we talked about sear for somebody um okay then we are going to anything for anything further on new business any new new business okay we'll move on to unfinished business I don't think there's anything to talk about under either of

045those items The Residency program or the building am I mistaken okay any else on the unfinished side of the legend move on then the committee reports negotiations andless Travis knows something different than I do I don't think we anything to talk about nothing unless he negotiated something over the weekend uh we'll move on then to the facilities committee we meeting this Friday oh wow like a Christmas party yeah yeah very well yeah all right and then on policy I don't know the result of your of your prayer and reflection is anyone post to tbling those to the new year no I did have some questions I don't if they can be answered prior to but yeah great um not a lot just a few so on p on policy AC which is the first policy

046on Section e um it says no later than October 15 2020 the superintendent shall develop and provide to the board for approval of coordinated written District anti-discrimination plan do we have that plan since it's was due four years ago we we do there their do their documents uh in actually in policy okay yeah the plan I think the plan is is in regy I'm just as we're approving a policy if there're supposed to be yeah it's in the regulations I don't know we have a standalone plan okay but there's a whole bunch of actually regulations on this uh in this group of policies that deals with discrimination and and process great great question um the other thing is just an example of is policy ihba which is number 10 um the formatting that I'm seeing

047is like different with every single policy yeah so something to work on it's not urgent but is having a consistent format for policies including font including you know where you put you know a lot of them have the name of the policy inside the gray box and some of them are outside the gray box and this one has no has no yeah so um just for consistency um and then good um policy JH which is number 13 is the attendance absenteeism and truism under excused absences number seven says such other good causes be acceptable to the principle permitted by law I.E College visit what is the criteria for that because I know that we often have have families that take vacations outside of normal school vacations we have families that take extended vacations two weeks

048long three weeks long we have families that travel outside the country for lengthy periods of time start school a month late leave school for a whole month if you follow the policy that all falls under treny so if we're going to have a policy shouldn't we be consistent with meeting the policy in the letter of the policy um it says 10 half days of unexcused absence during a school year shall constitute a visual truancy I think this is a policy it's great to have on the books but if we don't if we don't stick to it then it's useless piece of paper um so there's exceptions but there but what's the criteria and how are the exceptions made because we have St and and honestly when we approve a student to not be here for

049a month or you know if it's year year after year or if it's longer than that are we doing what's really in the best interest of that student if they're coming back to school after a month and they're behind how are they passing how are they catching up how are they how are we helping them succeed you know I just struggled with that I I just feel that this is a policy that we either need to hold to and be consistent on or get rid of it um and then policy jic student discipline process um one of the questions it says number two under letter B is restriction from school activities and when does my question was when does number two come into play um when there's repeat offenders of number one or repeat under

050offend offenders of of detention or in school suspension at what point do we start penalizing them and taking away activities and restricting them from activities otherwise I just feel like it's again inconsistent and you know and it if you turn around and suspend a kid or you or you put them into detention or they're kicked out of a class but later that day they're allowed to start in a game on the field or in a court how is that possible um so just some things just some thoughts they're not they're not identified in the policy but um just concerns that I have over inconsistency of of uh managing some of these policies on behavior and true so that's all I have thank you for reading and you know looking some feedback yeah the devil's in

051the details on a lot of these for sure we have about uh we got this bunch of policies and we have 20 more that the policy committee is able to meet this week we we get into the queue and we've got some catching up to do we definitely have some cleaning up to do and some clarifying to do but uh we shall do it we'll get caught up any other comments otherwise table the policy discussion I think it's the right to we'll move on then to the student representative report I don't think anyone has one on her behalf so we'll move to the superintendent's report okay uh some good stuff this time of year lots of lots of good events happening I'll share a few with you um this is happening at Lakeway holiday cards

052for Heroes last year Lakeway Elementary School students created many beautiful holiday themed cards for our New Hampshire veterans uh please plan to have these are directions went out to the teachers below general information about the program to assist you incorporating this project in your classroom so this will sent out C Chris kler sent this out to teachers students are encouraged to include messages thanking our veterans for their service and wishing them a happy holiday season holiday wishes should be know denominational students are welcome to create more than one card Congressional staff members will pick up will pick up the finished cards from your school as your state of convenience the congresswoman will distribute the cards to Veterans at the New Hampshire veterans home and Veterans Administration Medical Hospital the following week so cool activity kudos

053to our kids and teachers uh working uh to recognize veterans during the holiday season um we had a big middle school high school Winter concert here a couple weeks ago well attended and ex excellent performance by the students on couple weeks ago 125 I attended Early Childhood connection Summit in in gorm and this brought together 80 80 something ear childhood Educators from the North Country um last week relle Cox was my guest speaker rotary my time to come up with a speaker or do the speech myself given that choice I asked forelle if she has you and again I I said this a little bit the other night with the budget committee this district has so many things to be proud of above the notch is is one such thing uh and so Melle was

054kind enough to come to Rotary and talk to him a little bit about the kns at program as well as some of the other work she does with CTE and grant writing of course but uh especially above the knots which is well received uh we met met with Crystal in mail the other day about a a children's author this is actually a gentleman who uh I met on a conquered bus on the way to Boston a few weeks ago he was headed to the National Council of teachers of English conference in Boston and I was headed to r o Virginia to visit my daughter and I had a lway Elementary shirt on he goes oh you work in a school and we started talking and he started showing me some of his work award-winning author

055artist and we met with him last week about the possibility of him coming into LifeWay maybe even high school actually I can see him spending a little time with some of our kids in high school particularly art oriented students who may want to be published somay as poets Andor illustrators pretty cool stuff there coming up uh the budget committee will meet tomorrow evening and vote on our award articles that's 5:00 P pm at the Littleton Community House H room I will be there and then on Wednesday I'll be going to the state of New Hampshire monthly superintendent meeting and high the one of the highlights of that will be the naming of the uh the uh um superintend of the Year another connection I made uh this was through rotary Merl Grabowski who's a sales

056manager works with uh 96 or 93.7 96.7 KISS 102 KW a lot of our our local radio media and I'll be working with him some in the future perhaps to do a time a few times on there where I'll talk about school things that we're doing and so on look forward to doing that so lots lots going on lots to happen in the future and it's good to good to be in any questions with super what's the children's author's name real quick Matt Forest move on then public input okay look for a properly voted motion to enter into nonpublic session pressure forg all right I make a motion to enter into non public session under paragraph 2 section three of the RSA 91a col 3 of the right to no law four number two the

057hiring of any person as a public employee and number three matters which have discussed in public would likely adversely affect the reputation of any person other than a member of this board anything I missed two and three should cover it taking with us the superintendent and VA please and is there a second a second discussion all those in favor roll call vote please B motion carries for here we're now on public thank you God spe good night I

This transcript may contain errors introduced by automated or source-provided captioning. Bracketed descriptions such as [Music] are retained from the source. Passage divisions are editorial aids and do not alter the wording.